9.6 Sealing Chute
Ⅰ Major Items
9.6.1 Countersunk screws fixing the sealing chute shall be lower than sliding surface of the chute.
Quantity checked:All.
Checking method:Check by observation.
9.6.2 Reserved gaps of respective parts in sealing chute for thermal expansion shall meet the requirements of design technical documents.
Quantity checked:All.
Checking method:Check installation quality records or by field tests.
Ⅱ General Item
9.6.3 Allowable deviation of sealing chute installation shall be in accordance with those specified in Table 9.6.3.Refer to Figure 9.6.3.
Quantity checked:All.
Checking method:Refer to 9.6.3.
Table 9.6.3 Allowable deviation of sealing chute installation(mm)
![img](https://epubservercos.yuewen.com/C62A70/18000635008205506/epubprivate/OEBPS/Images/txt009_15.jpg?sign=1738967787-xPfxm7wUMvpla6pc5eRv82auhQR0c1r5-0-23d0b5580fc27ee0d882ac50fd5dc844)
![img](https://epubservercos.yuewen.com/C62A70/18000635008205506/epubprivate/OEBPS/Images/txt009_16.jpg?sign=1738967787-gTdH9fNJQl4TTwbLV6K18hG2SfWaPmgq-0-c2b6e899bdd7663fe6c9a4803d0d8097)
Figure 9.6.3 Elevation measurement of sealing chute
1-Pallet rail;2-Sealing chute;3-Longitudinal center line of traveling grate equipment;4-Special sample rod for rail