SH/T3169-2012长输油气管道站场布置规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

Foreword

According to the requirements specified in the Plan for Revising the Second Batch of Professional Standards in 2011(Document Number:[2011]No.134)issued by the Ministry of Industry and Information of the People's Republic of China,this Specification is developed by its development team based on wide and intensive investigations and studies made,practices and experience summarized and with references to international codes and advanced foreign standards.

This Specification comprises 9 chapters and 11 appendixes.

The main technical contents of this Specification includes the basic requirements for layout of longdistance oil/gas pipeline stations,site selection and regional layout,general layout,vertical layout,pipe coordination,landscaping and environmental protection,etc.

China Petrochemical Corporation(Sinopec Group)is in charge of the administration of this Specification,Sinopec Technical Center for General Plot Plan Design is in charge of its routine management,and China Petroleum Pipeline Engineering Co.,Ltd is in charge of explanation of specific technical contents.If any comments and recommendations are proposed in implementation of this Specification,please send your comments/recommendations to the routine management organization and chief development organization.

Routine management organization:

      Sinopec Technical Center for General Plot Plan Design

      Address:No.27,West Zhongzhou Road,Luoyang City,Henan Province

      Postcode:471003

      Tel:0379-64887144

      Fax:0379-64887301

Chief Development Organization:

      China Petroleum Pipeline Engineering Co.,Ltd.

      Address:No.146,Heping Road,Langfang City,Hebei Province

      Postcode:065000

Participating Development Organizations:

      East China Pipeline Design and Research Institute

      Shengli Engineering & Consulting Co.,Ltd

      Luoyang Petrochemical Engineering Corporation/Sinopec

Chief Drafting Staff:

      Lu Yong Guo Baoshen Bian Rongxia Zhang Jianguo Wan Jun

      Li Xiangyong Li Yayun Li Jin Yi Shiyou Dong Xu

      Zhang Wenwei Zhao Rui Jian Zhaoming Ye Hongyue

      Chen Feng Yu Liangjun Hu Baisong Liu Zhongqing Gong Yunfeng

Chief Reviewing Staff:

      Zhang Sheng Chen Ji Yu Jian Wang Zhiyong Jiang Minghuo

      Zhou Yun Yan Chaofan Hang Xiulian Ji Baisen Zhang Zhongming

      Liang Yan Zhang Ping Dongye Changyu

      This Specification is initially issued.